Consultation
Goals, budget, site visit and measurements.
Design
Layout, material, pattern, slope and drainage plan.
Written estimate
Itemized scope: excavation depth, base, edging, haul-away.
Contract & permits
Schedule, payments, warranty and permits if needed.
Build
811 marks, excavate, base in lifts, bedding, pavers, restraint.
Walkthrough
Check slope, joints and cleanup, and get care instructions.
Typical timeline
| Stage | Typical duration |
|---|---|
| Consultation to estimate | 1–2 weeks |
| 811 locate request | A few business days (varies by state) |
| Build, 200–400 sq ft paver patio | Often 2–5 working days |
| Polymeric sand cure | Per product, often 24–48 hours before use |
Durations are illustrative. Weather, permits, access and crew schedules change them.

What happens on build days
- Layout with paint, stakes and string lines, with slope set away from the house
- Excavation and haul-away
- Subgrade compaction, plus geotextile where needed
- Base placed and compacted in lifts
- Bedding sand screeded
- Pavers laid, cut and edged
- Compaction, joint sand and cleanup
What you can do
- Mark sprinkler lines and private utilities, since 811 only covers public lines
- Plan access for equipment and material delivery
- Agree where spoil and pallets go